2 Second Lean: Drill Press Double Stop Posted on Dec 25, 2011 By Nate Lowrie A simple change saved minutes of setup time.
2 Second Lean: Shipping Labels Posted on Dec 24, 2011 By Nate Lowrie Using self adhesive labels to save time and supplies
New Kit Revisions and Z-Axis Binding Problem Fix Posted on Dec 23, 2011 By Nate Lowrie See what's changed and how to fix a nagging problem on the old style kits.
New Z-Axis Assembly Video Posted on Dec 03, 2011 By Nate Lowrie These videos walk you through the Z-Axis Assembly Step by Step
2 Second Lean: Drill Press Posted on Nov 30, 2011 By Nate Lowrie Eliminating part of a process with a simple bit change.
2 Second Lean: Miter Saw Hood Posted on Nov 30, 2011 By Nate Lowrie It's always better to contain dust and chips then to clean them up afterwards.
New Assembly Video Posted on Nov 30, 2011 By Nate Lowrie Learn how to assemble and adjust our linear motion carriages